Home › BRAKE › BRAKE CONTROL › VEHICLE STABILITY CONTROL SYSTEM

VEHICLE STABILITY CONTROL SYSTEM > TERMINALS OF ECU

for Preparation Click here



TERMINALS OF ECU

C110610E05


Symbols (Terminal No.)
Terminal Description
GND (1)
Skid control ECU ground
+BM1 (2)
Power supply for motor
FR+ (3)
Front RH wheel speed sensor power supply output
FL- (4)
Front LH wheel speed sensor input
RR+ (5)
Rear RH wheel speed sensor power supply output
RL- (6)
Rear LH wheel speed sensor input
STP (7)
Stop light switch input
NEO (10) (*2)
Center diff. lock indicator light input
CANH (11)
CAN communication line H
SP1 (12)
Speed signal output to combination meter
D/G (13)
Diagnosis tester communication line
P (14)
Shift position indicator P signal input
INFR (15) (*1)
AUTO LSD indicator light output
STPO (16)
Stop light operation relay output
FR- (17)
Front RH wheel speed sensor input
FL+ (18)
Front LH wheel speed sensor power supply output
RR- (19)
Rear RH wheel speed sensor input
RL+ (20)
Rear LH wheel speed sensor power supply output
EXI4 (21) (*2)
4WD control (L4) switch input
TS (24)
Sensor test terminal (Signal check switch) input
CANL (25)
CAN communication line L
EXI3 (26) (*2)
ADD (Auto disconnected differential lock) change over actuator switch input (*3) Ground (*4)
EXI (27) (*2)
Center diff. lock switch input
PKB (28)
Parking brake switch input
WA (29)
ABS warning light output
BZ (30)
Skid control buzzer output
+BS (31)
Power supply for solenoid
GND2 (32)
Skid control ECU ground
HDCW (33) (*3)
DAC indicator light output
IND (34)
SLIP indicator light output
WT (35) (*2)
VSC OFF indicator light output
VSCW (36)
VSC TRAC warning light output
FRO (37)
Front RH wheel speed output
FLO (38)
Front LH wheel speed output
LBL (41)
Brake fluid level warning switch input
WFSE (42)
Write flash enable input
CSW (43) (*1)
AUTO LSD switch input
HDCS (44) (*3)
DAC switch input
STP2 (45)
Stop light switch input
IG1 (46)
IG1 power supply

C124763E02


Symbols (Terminal No.)
Terminal Description
IG2 (1)
IG2 Power supply
+BM2 (2)
Power supply for motor
BRL (3)
BRAKE warning light output
GND3 (4)
Skid control ECU ground
  1. (*1): 2WD
  2. (*2): 4WD
  3. (*3): Multi Mode 4WD
  4. (*4): Full Time 4WD

TERMINAL INSPECTION
Disconnect the connector and measure the voltage or resistance on the wire harness side.

HINT:
Voltage cannot be measured with the connector connected to the skid control ECU as the connector is water resistance.


C124764E04


Symbols (Terminal No.)
Wiring Color
Terminal Description
Condition
Specified Condition
+BM1 (S28-2) - GND (S28-1, 32) (S29-4)
Y-B - W-B
Power supply for motor
(From battery)
Always
10 to 14 V
STP (S28-7) - GND (S28-1, 32) (S29-4)
G-B - W-B
Stop light switch input
Stop light switch ON → OFF (Brake pedal depressed → released)
8 to 14 V → Below 1.5 V
P (S28-14) - GND (S28-1, 32) (S29-4)
G-B - W-B
Shift position indicator P signal input
Ignition switch ON, shift P position → any shift position except P
8 to 14 V → Below 1.5 V
PKB (S28-28) - GND (S28-1, 32) (S29-4)
LG - W-B
Parking brake switch input
Ignition switch ON, parking brake switch ON → OFF
Below 1.5 V → 10 to 14 V
+BS (S28-31) - GND (S28-1, 32) (S29-4)
Y - W-B
Power supply for solenoid
(From battery)
Always
10 to 14 V
LBL (S28-41) - GND (S28-1, 32) (S29-4)
LG - W-B
Brake fluid level warning switch input
Brake fluid level is - 5 mm from the minimum level → maximum level
Below 1 Ω → 1.9 to 2.1 kΩ
STP2 (S28-45) - GND (S28-1, 32) (S29-4)
G-Y - W-B
Stop light switch input
Stop light switch ON → OFF
(Brake pedal depressed → released)
8 to 14 V → Below 1.5 V
IG1 (S28-46) - GND (S28-1, 32) (S29-4)
B-R - W-B
IG1 power supply
Ignition switch OFF → ON
Below 1 V → 10 to 14 V
IG2 (S29-1) - GND (S28-1, 32) (S29-4)
B-O - W-B
IG2 power supply
Ignition switch OFF → ON
Below 1 V → 10 to 14 V
+BM2 (S29-2) - GND (S28-1, 32) (S29-4)
Y-B - W-B
Power supply for motor
(From battery)
Always
10 to 14 V