Home › SUSPENSION & AXLE › SUSPENSION › FRONT STABILIZER BAR

FRONT STABILIZER BAR > INSPECTION

for Preparation Click here



1. INSPECT FRONT STABILIZER LINK ASSEMBLY LH


    G021679
  1. As shown in the illustration, flip the ball joint stud back and forth 5 times, before installing the nut.

  1. Using a torque wrench, turn the nut continuously at a rate of 2 - 4 seconds per 1 turn and take the torque reading on the 5th turn.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf } or less

  1. Check for any cracks and grease leaks on the ball joint dust cover.