Home › SUSPENSION & AXLE › SUSPENSION › REAR STABILIZER BAR

REAR STABILIZER BAR > INSPECTION

for Preparation Click here



1. INSPECT REAR STABILIZER LINK ASSEMBLY


    D028478
  1. As shown in the illustration, flip the ball joint stud back and forth 5 times before installing the nut.

  1. Using a torque wrench, turn the nut continuously at a rate of 2 - 4 seconds per 1 turn, and take the torque reading on the 5th turn.

    Torque:
    0.05 - 2.0 N*m{ 0.5 -20 kgf*cm , 0.4 - 17.7 in.*lbf }