Home › BODY ELECTRICAL › HORN › HIGH PITCHED HORN

HIGH PITCHED HORN > INSTALLATION

for Preparation Click here



1. INSTALL HIGH PITCHED HORN ASSEMBLY


    B065154
  1. Place the stay onto the baffle part in the radiator support upper, and then install the horn assembly with the bolt.

    Torque:
    20 N*m{ 199 kgf*cm , 15 ft.*lbf }

  1. Connect the connector.