Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › BLOWER UNIT

BLOWER UNIT > INSTALLATION

for Preparation Click here



1. INSTALL BLOWER ASSEMBLY


    I034332E01
  1. Install the blower assembly with the claw fitting.

  1. Install the bolt, 2 screws and nut.

    Torque:
    Bolt:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
    Nut:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



    I034331E01
  1. Install the 7 clamps and connect the connectors.



2. INSTALL AIR DUCT NO. 2


3. INSTALL INSTRUMENT PANEL REGISTER ASSEMBLY NO. 2


4. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER NO. 2


5. INSTALL GLOVE COMPARTMENT DOOR SUB-ASSEMBLY


6. INSTALL GLOVE COMPARTMENT DOOR STOPPER SUB-ASSEMBLY


7. INSTALL INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY NO. 2


8. INSTALL COWL SIDE TRIM BOARD RH


9. INSTALL CONSOLE BOX ASSEMBLY REAR


10. INSTALL CONSOLE UPPER PANEL GARNISH NO. 2


11. INSTALL CONSOLE UPPER PANEL GARNISH NO. 1


12. INSTALL CONSOLE PANEL SUB-ASSEMBLY UPPER


13. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY