VACUUM SWITCHING VALVE > INSPECTION |
| 1. INSPECT VACUUM SWITCHING NO. 1 VALVE ASSEMBLY |
![]() |
Inspect the VSV for open circuit.
Using an ohmmeter, check resistance between the terminals.
![]() |
Inspect the VSV for ground.
Using an ohmmeter, check that there is no continuity between each terminal and the body.
If there is continuity, replace the VSV.
![]() |
Inspect the VSV operation.
Check that air does not flow from ports.
![]() |
Apply battery positive voltage across the terminals.
Check that air flows from ports.
If operation is not as specified, replace the VSV.