Home › ENGINE ยท 2UZ-FE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > INSPECTION

for Preparation Click here



1. INSPECT AIR SWITCHING VALVE


    A133805E01
  1. Blow air into port A and check that air is not discharged from port B.



    A133806E01
  1. Apply positive battery between the terminals.

  1. Blow air into port A and check that air is discharged from port B.
    If operation is not as specified, replace the air switching valve.



2. INSPECT NO. 2 AIR SWITCHING VALVE


    A133807E01
  1. Blow air into port B and check that air is not discharged from port C.



    A133808E01
  1. Apply vacuum (30 kPa (306 gf/cm2, 4.35 psi)) to port A, blow air into port B and check that air is discharged from port C.
    If operation is not as specified, replace the No. 2 air switching valve.