TOWING CONVERTER RELAY > INSTALLATION |
| 1. INSTALL TOWING CONVERTER RELAY |
| 2. INSTALL ROOF SIDE GARNISH ASSEMBLY INNER LH |
Install the side garnish and engage the 9 clips.
Install the 3 bolts and clip.
Install the tonneau cover hook and the screw.
| 3. INSTALL DECK TRIM SIDE PANEL ASSEMBLY LH |
Install the side panel and engage the 6 clips.
![]() |
Install the 3 screws and clips.
Install the screw and deck trim cover.
| 4. INSTALL DECK TRIM SIDE BOARD UPR LH |
Install the side board and the screw.
| 5. INSTALL DECK TRIM COVER REAR |
| 6. INSTALL DECK FLOOR BOX LH |
![]() |
Install the deck floor box, luggage hold belt and bolt.
Install the cover and the claws.
| 7. INSTALL DECK FLOOR BOX RH |
| 8. INSTALL DECK BOARD ASSEMBLY |
![]() |
Install the deck board assembly and the 2 bolts.
| 9. INSTALL DECK BOARD SUB-ASSEMBLY |
Install the deck board sub-assembly and the 2 bolts.
| 10. INSTALL REAR FLOOR MAT SUPPORT PLATE REAR |
![]() |
Install the mat support plate and 5 bolts.
| 11. INSTALL BACK DOOR WEATHERSTRIP |
| 12. INSTALL TONNEAU COVER RETRACTOR SUB-ASSEMBLY |