Home › SUSPENSION & AXLE › SUSPENSION CONTROL › HEIGHT CONTROL RESERVOIR

HEIGHT CONTROL RESERVOIR > INSTALLATION

for Preparation Click here



1. INSTALL HEIGHT CONTROL RESERVOIR ASSEMBLY
  1. Install the height control reservoir assembly with the 2 bolts.

    Torque:
    29 N*m{ 300 kgf*cm , 21 ft.*lbf }



2. CONNECT HEIGHT CONTROL TUBE NO. 7
  1. Install 2 new O-rings, a new plate, a new plug and connect the height control tube No. 7.

    NOTICE:
    Refer to PRECAUTION of removal and installation of the height control tube (Click here).



3. CONNECT HEIGHT CONTROL TUBE NO. 6
  1. Install 2 new O-rings, a new plate, a new plug, and connect the height control tube No. 6.

    NOTICE:
    Refer to PRECAUTION of removal and installation of the height control tube (Click here).



4. CONNECT HEIGHT CONTROL TUBE NO. 2
  1. Coat 2 new O-rings with MP grease.

  1. Push the height control tube No. 2 in straight to connect it until the clip makes "click" sound.

  1. Install the holder.



5. CHECK AIR LEAK


  1. Check the connections of tube and parts for fluid leakage.


    C099149E01



6. INSTALL SPARE DISC WHEEL