Home › ENGINE ยท 1GR-FE › CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY
  1. Install the generator assembly with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Install the wire harness clamp bracket with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the wire harness.

    1. Connect the wire harness to the terminal B and install the nut.

      Torque:
      9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }

    2. Connect the connector to the generator assembly.

    3. Install the wire harness stay with the bolt.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



2. INSTALL BATTERY


3. INSTALL FAN AND GENERATOR V BELT


    A076442E02
  1. While turning the belt tensioner counterclockwise, align with its holes, and then insert a bar of 6 mm (0.24 in.) into the holes to fix the belt tensioner.

  1. Install the V-ribbed belt.

  1. While turning the belt tensioner counterclockwise, remove the bar.



    A076443E02
  1. If it is hard to install the V-ribbed belt, perform the following procedure.

    1. Put the V-ribbed belt on all parts except the P/S pump, as shown in the illustration.

    2. While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.



4. INSTALL ENGINE NO. 1 UNDER COVER SUB-ASSEMBLY
  1. Install the engine under cover sub-assembly No. 1 with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }



5. INSTALL V-BANK COVER


    A075593E01
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }