Home › ENGINE ยท 1GR-FE › STARTING › STARTER (for Standard)

STARTER (for Standard) > REASSEMBLY

for Preparation Click here



1. INSTALL STARTER CENTER BEARING CLUTCH SUB-ASSEMBLY


    A073990
  1. Install the drive lever set pin to the starter center bearing clutch.

  1. Install the starter center bearing clutch and drive lever set pin together to the starter drive housing.



2. INSTALL PLANETARY GEAR


    A076128
  1. Apply grease to the planetary gears and pin parts of the planetary shaft.

  1. Install the 3 planetary gears.



3. INSTALL STARTER ARMATURE ASSEMBLY
  1. Apply grease to the plate washer and armature shaft.

  1. Install the armature shaft to the starter commutator end frame assembly.



    A073993
  1. Using snap ring pliers, install the plate washer and new snap ring.



    A058810E15
  1. Using vernier calipers, measure the snap ring.

    Maximum length:
    5.0 mm (0.197 in.)

    If the length is greater than maximum, replace the new snap ring.



4. INSTALL STARTER COMMUTATOR END FRAME COVER
  1. Install the starter commutator end frame cover.



5. INSTALL STARTER ARMATURE PLATE
  1. Insert the starter armature plate to the starter yoke assembly.



    A073991
  1. Align the keyway of the plate with the key inside the starter yoke, and install the plate.



6. INSTALL STARTER COMMUTATOR END FRAME ASSEMBLY


    A058587
  1. Align the starter-commutator-rubber -end frame with the convex cutout of starter yoke.

  1. Install starter-commutator-end -frame to starter yoke assembly.



7. INSTALL STARTER YOKE ASSEMBLY


    A076130
  1. Align the key of the starter yoke assembly with the keyway of starter drive housing.



    A076127
  1. Install the starter yoke assembly with the 2 through bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }



8. INSTALL REPAIR SERVICE STARTER KIT
  1. Apply grease to the plunger and hook.



    A076131
  1. Hang the plunger hook of the repair service starter kit to the drive lever.

  1. Install the plunger and return spring.



    A076124
  1. Install the repair service starter kit with the 2 screws.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



    A076123
  1. Connect the lead wire to the terminal with the nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7.4 ft.*lbf }