Home › Engine / Hybrid System › 1GR-FE EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSPECTION

for Preparation Click here



1. INSPECT PURGE VSV


    A211313E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    23 to 26 Ω
    1 - Body ground
    Always
    10 MΩ or higher
    2 - Body ground
    Always
    10 MΩ or higher

    HINT:
    When measuring the coil resistance make sure that the surface temperature of the purge VSV is 20°C.



  1. Check the operation of the purge VSV.



      A211314E03
    1. Check that air does not flow from port E to port F.
      Text in Illustration 
      *1
      Port E
      *2
      Port F
      *a
      Does not flow



    2. A211315E03
    3. Apply battery voltage to the connector and check the VSV operation.

      OK:
      Measurement Condition
      Specified Condition
      Battery positive (+) → Terminal 1
      Battery negative (-) → Terminal 2
      Air flows from port E to port F

      Text in Illustration 
      *1
      Air
      If the result is not as specified, replace the purge VSV.