Home › Engine / Hybrid System › 1GR-FE EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL CANISTER ASSEMBLY


    A225361
  1. Attach the claw and install the canister with the 3 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



    A225430E01
  1. Connect the vent line hose.
    Text in Illustration 
    *1
    Vent Line Hose
    V100136
    Push

    1. Push the hose into the port and push the retainer to lock it.

      NOTICE:
      1. Check for damage or foreign objects on the connected part.
      2. After connecting, check that the vent hose and valve are securely connected by pulling on them.

  1. Connect the air inlet line hose.

    NOTICE:
    1. Check for damage or foreign objects on the connected part.
    2. After connecting, check that the vent hose and valve are securely connected by pulling on them.

  1. Connect the purge line hose.

  1. Connect the connector.



2. INSTALL SPARE TIRE