IGNITION COIL AND SPARK PLUG > INSTALLATION |
| 1. INSTALL SPARK PLUG |
Install the 6 spark plugs.
| 2. INSTALL IGNITION COIL ASSEMBLY |
Install the 6 ignition coil assemblies with the 6 bolts.
Connect the 6 ignition coil connectors.
| 3. INSTALL NO. 2 EMISSION CONTROL VALVE SET |
Install the No. 2 emission control valve set with the 3 nuts.
![]() |
Align the paint mark with the projection and connect the No. 1 air hose.
| *1 | Paint Mark |
| *2 | Projection |
| *a | Upper |
| *b | LH Side |
Connect the No. 2 emission control valve set connector.
| 4. INSTALL NO. 2 AIR TUBE |
![]() |
Install 2 new gaskets to the No. 2 air tube.
| *1 | New Gasket |
| *2 | No. 2 Air Tube |
Install the No. 2 air tube with the 2 bolts and 2 nuts.
| 5. INSTALL NO. 1 EMISSION CONTROL VALVE SET |
Install the No. 1 emission control valve set with the 3 nuts.
![]() |
Align the paint mark with the projection and connect the No. 1 air hose.
| *1 | Projection |
| *2 | Paint mark |
| *a | RH Side |
| *b | Upper |
Connect the No. 1 emission control valve set connector.
| 6. INSTALL AIR TUBE |
![]() |
Install 2 new gaskets to the air tube.
| *1 | New Gasket |
| *2 | Air Tube |
Install the air tube with the 2 bolts and 2 nuts.
| 7. INSTALL AIR CLEANER CAP AND HOSE |
![]() |
Install the air cleaner cap and hose.
| *a | Upper |
| *b | Front |
| *c | RH |
| *d | Align cutout portion of hose with protrusion of throttle |
| *e | Paint Mark |
Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.
Tighten the clamp.
Attach the 4 clamps and connect the ventilation hose, vacuum hose and mass air flow meter connector.
| 8. INSTALL V-BANK COVER |
![]() |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
| *1 | Pin |
| *2 | V-bank Cover Hook |