Home › Engine / Hybrid System › 1GR-FE ENGINE CONTROL › IGNITION COIL AND SPARK PLUG

IGNITION COIL AND SPARK PLUG > INSTALLATION

for Preparation Click here



1. INSTALL SPARK PLUG
  1. Install the 6 spark plugs.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



2. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 6 ignition coil assemblies with the 6 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 6 ignition coil connectors.



3. INSTALL NO. 2 EMISSION CONTROL VALVE SET
  1. Install the No. 2 emission control valve set with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A288452E02
  1. Align the paint mark with the projection and connect the No. 1 air hose.
    Text in Illustration 
    *1
    Paint Mark
    *2
    Projection
    *a
    Upper
    *b
    LH Side

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the No. 2 emission control valve set connector.



4. INSTALL NO. 2 AIR TUBE


    A289303E01
  1. Install 2 new gaskets to the No. 2 air tube.
    Text in Illustration 
    *1
    New Gasket
    *2
    No. 2 Air Tube

    NOTICE:
    Be careful not to damage the installation surfaces of the gaskets.

  1. Install the No. 2 air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



5. INSTALL NO. 1 EMISSION CONTROL VALVE SET
  1. Install the No. 1 emission control valve set with the 3 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A288448E01
  1. Align the paint mark with the projection and connect the No. 1 air hose.
    Text in Illustration 
    *1
    Projection
    *2
    Paint mark
    *a
    RH Side
    *b
    Upper

    HINT:
    Make sure the direction of the hose clamp is as shown in the illustration.

  1. Connect the No. 1 emission control valve set connector.



6. INSTALL AIR TUBE


    A289302E01
  1. Install 2 new gaskets to the air tube.
    Text in Illustration 
    *1
    New Gasket
    *2
    Air Tube

    NOTICE:
    Be careful not to damage the installation surfaces of the gaskets.

  1. Install the air tube with the 2 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



7. INSTALL AIR CLEANER CAP AND HOSE


    A223697E01
  1. Install the air cleaner cap and hose.
    Text in Illustration 
    *a
    Upper
    *b
    Front
    *c
    RH
    *d
    Align cutout portion of hose with protrusion of throttle
    *e
    Paint Mark

    1. Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.

      Torque:
      5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    2. Tighten the clamp.

      Torque:
      5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    3. Attach the 4 clamps and connect the ventilation hose, vacuum hose and mass air flow meter connector.

      HINT:
      The direction of the hose clamp is indicated in the illustration.



8. INSTALL V-BANK COVER


    A229926E01
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Pin
    *2
    V-bank Cover Hook