Home › Engine / Hybrid System › 1GR-FE EMISSION CONTROL › PURGE VALVE

PURGE VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER


    A229925E01
  1. Raise the front of the V-bank cover to detach the 2 pins. Then detach the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Pin
    *2
    V-bank Cover Hook



2. REMOVE PURGE VSV


A223554
  1. Disconnect the purge VSV connector.

  1. Disconnect the 2 purge line hoses.



    A223555
  1. Remove the bolt and purge VSV.