Home › Engine / Hybrid System › 1GR-FE EMISSION CONTROL › PCV VALVE

PCV VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER


    A229925E01
  1. Raise the front of the V-bank cover to detach the 2 pins. Then detach the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Pin
    *2
    V-bank Cover Hook



2. DISCONNECT HEATER HOSE


    A223557
  1. Disconnect the heater hose clamp.



3. REMOVE PCV VALVE SUB-ASSEMBLY


    A223558
  1. Loosen the hose clamp and disconnect the PCV hose from the valve.



    A223559
  1. Remove the valve.