AIR SWITCHING VALVE (for Bank 2) > INSTALLATION |
| 1. INSTALL NO. 2 EMISSION CONTROL VALVE SET |
Install the No. 2 emission control valve set with the 3 nuts.
![]() |
Align the paint mark with the projection and connect the No. 1 air hose.
| *1 | Paint Mark |
| *2 | Projection |
| *a | Upper |
| *b | LH Side |
Connect the No. 2 emission control valve set connector.
| 2. INSTALL NO. 2 AIR TUBE |
![]() |
Install 2 new gaskets to the No. 2 air tube.
| *1 | New Gasket |
| *2 | No. 2 Air Tube |
Install the No. 2 air tube with the 2 bolts and 2 nuts.