INTEGRATION RELAY > ON-VEHICLE INSPECTION |
| 1. REMOVE NO. 1 RELAY BLOCK COVER |
Remove the No. 1 relay block cover.
| 2. INSPECT NO. 1 INTEGRATION RELAY |
![]() |
Using a screwdriver, detach the 2 claws and disconnect the No. 1 integration relay from the engine room junction block.
| *1 | Protective Tape |
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1E-1 - 1C-8 | Battery voltage is not applied to terminals 1C-6 and 1C-7 | 10 kΩ or higher |
| 1E-1 - 1C-8 | Battery voltage is applied to terminals 1C-6 and 1C-7 | Below 1 Ω |
| *a | Component with harness connected (No. 1 Integration Relay) |
Attach the 2 claws to install the No. 1 integration relay to the engine room junction block.
| 3. INSTALL NO. 1 RELAY BLOCK COVER |
Install the No. 1 relay block cover.