4WD CONTROL SWITCH > INSTALLATION |
| 1. INSTALL TRANSFER POSITION SWITCH |
![]() |
Attach the 3 claws to install the transfer position switch.
| 2. INSTALL FRONT UPPER CONSOLE PANEL GARNISH |
for VF2A:
Attach the 6 claws to install the front upper console panel garnish.
for 2WD, for VF2BM, VF4BM:
Attach the 10 claws to install the front upper console panel garnish.
| 3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY |
Connect each connector.
Attach the 10 clips to install the upper console panel sub-assembly.

| *A | for VF2A | *B | for VF2BM, VF4BM |
| *C | for 2WD | - | - |