Home › Engine / Hybrid System › 1GR-FE EMISSION CONTROL › AIR SWITCHING VALVE (for Bank 1)

AIR SWITCHING VALVE (for Bank 1) > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER


    A229925E01
  1. Raise the front of the V-bank cover to detach the 2 pins. Then detach the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Pin
    *2
    V-bank Cover Hook



2. REMOVE AIR CLEANER CAP AND HOSE


    A224721
  1. Remove the air cleaner cap and hose.

    1. Disconnect the mass air flow meter connector, vacuum hose and ventilation hose and detach the 4 clamps.

    2. Loosen the clamp.

    3. Unfasten the 4 hook clamps, and then remove the bolt and air cleaner cap and hose.



3. REMOVE AIR TUBE


    A288445
  1. Remove the 2 bolts, 2 nuts and air tube.

  1. Remove the 2 gaskets from the air tube.

    NOTICE:
    Be careful not to damage the installation surfaces of the gaskets.



4. REMOVE NO. 1 EMISSION CONTROL VALVE SET


    A288446
  1. Disconnect the No. 1 emission control valve set connector.

  1. Disconnect the No. 1 air hose from the No. 1 emission control valve set.



    A288447
  1. Remove the 3 nuts and No. 1 emission control valve set.