Home › Vehicle Interior › HEATING / AIR CONDITIONING › AIR CONDITIONING SYSTEM (for Automatic Air Conditioning System)

AIR CONDITIONING SYSTEM (for Automatic Air Conditioning System) > IG Power Source Circuit

for Preparation Click here


DESCRIPTION

The main power source is supplied to the air conditioning control assembly when the ignition switch is ON.
The power is used for operating the air conditioning control assembly, servo motors, etc.

WIRING DIAGRAM


E229257E30


INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.

1.CHECK HARNESS AND CONNECTOR (AIR CONDITIONING CONTROL ASSEMBLY - BATTERY)
  1. Disconnect the D19 air conditioning control assembly connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    D19-10(IG) - Body ground
    Ignition switch off
    Below 1 V
    D19-10(IG) - Body ground
    Ignition switch ON
    11 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.CHECK HARNESS AND CONNECTOR (AIR CONDITIONING CONTROL ASSEMBLY - BODY GROUND)
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    D19-16(GND) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)