Home › Engine / Hybrid System › FA20 ENGINE MECHANICAL › DRIVE BELT

DRIVE BELT > INSTALLATION

for Preparation Click here



1. INSTALL FAN AND GENERATOR V BELT


A276034E01
  1. Set the fan and generator V belt onto every part.
    Text in Illustration 
    *1
    Idler
    *2
    Generator
    *3
    Tensioner
    *4
    Water Pump
    *5
    Crankshaft
    *6
    A/C Compressor (w/ Air Conditioning System)
    Idler Pulley Bracket (w/o Air Conditioning System)

  1. While turning the belt tensioner clockwise, remove the 3 mm (0.118 in.) hexagon wrench.

    NOTICE:
    Make sure that the fan and generator V belt is properly installed to each pulley.

  1. Check that the fan and generator V belt fits properly in the ribbed grooves.

    HINT:
    Make sure to check by hand that the fan and generator V belt have not slipped out of the grooves on the bottom of the pulley.



2. INSTALL BELT GENERATOR COVER
  1. Install the belt generator cover with the 2 blots.

    Torque:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }

  1. Engage the 2 wire harness clamps and install the wire harness to the belt generator cover.



3. INSTALL GENERATOR COVER
  1. Install the generator cover with the 2 blots.

    Torque:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }



4. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
  1. Install the air cleaner cap with air cleaner hose with the 3 blots.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Install the air cleaner cap with air cleaner hose with the 2 hose clamps.

    Torque:
    2.0 N*m{ 20 kgf*cm , 18 in.*lbf }

  1. Connect the No. 2 ventilation hose.

  1. Connect the mass air flow meter connector.

  1. Engage the wire harness clamp and install the wire harness to the air cleaner cap.