Home › Engine / Hybrid System › FA20 EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VALVE
  1. Connect the joint wire harness to the purge valve.

  1. Connect the No. 1 fuel vapor feed hose and No. 2 fuel vapor feed hose, and install the purge valve with the joint wire harness.

  1. Connect the manifold absolute pressure sensor connector.

  1. Connect the purge valve connector.

  1. Install the nut and purge valve.

    Torque:
    6.4 N*m{ 65 kgf*cm , 57 in.*lbf }



2. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
  1. Engage the 3 claws and install the No. 1 engine cover sub-assembly.