FRONT FENDER GARNISH > INSTALLATION |
| 1. INSTALL FRONT FENDER MOULDING SUB-ASSEMBLY LH |
Clean the attachment surface.
Using an infrared light, heat the double-sided adhesive tape remaining on the front fender panel.
| Item | Temperature |
| Front Fender Panel | 40 to 60°C (104 to 140°F) |
Using a piece of cloth, rub the remaining double-sided tape off the front fender panel while it is hot from the infrared light.
Using a non-residue solvent, clean the attachment surface.
Using an infrared light, heat the front fender moulding sub-assembly installation surface of the front fender panel and new front fender moulding sub-assembly.
| Item | Temperature |
| Front Fender Panel | 40 to 60°C (104 to 140°F) |
| Front Fender Moulding Sub-Assembly | 20 to 30°C (68 to 86°F) |
![]() |
Install the front fender moulding sub-assembly with the 6 clips.