Home › Vehicle Exterior › HORN › HORN

HORN > INSTALLATION

for Preparation Click here



1. INSTALL LOW PITCHED HORN ASSEMBLY (except CHINA)
  1. Install the low pitched horn assembly with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the connector.



2. INSTALL HIGH PITCHED HORN ASSEMBLY (for CHINA)
  1. Install the high pitched horn assembly with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the connector.



3. INSTALL HORN BRACKET SUB-ASSEMBLY
  1. Install the horn bracket sub-assembly with the bolt and nut.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



4. INSTALL HIGH PITCHED HORN ASSEMBLY (except CHINA)
  1. Install the bolt and high pitched horn assembly with horn bracket sub-assembly.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the connector.



5. INSTALL LOW PITCHED HORN ASSEMBLY (for CHINA)
  1. Install the bolt and low pitched horn assembly with horn bracket sub-assembly.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the connector.



6. INSTALL FRONT BUMPER COVER
(Click here)