Home › Suspension › REAR SUSPENSION › TOE CONTROL LINK

TOE CONTROL LINK > DISASSEMBLY

for Preparation Click here


HINT:
  1. Use the same procedure for the RH and LH sides.
  2. The procedure listed below is for the LH side.



1. REMOVE LATERAL CONTROL ROD BUSHING SUB-ASSEMBLY


    C257457E01
  1. Using SST, lateral control rod bushing sub-assembly from the toe control link sub-assembly LH.

    SST
    09710-18010