Home
›
Suspension
›
REAR SUSPENSION
›
TOE CONTROL LINK
TOE CONTROL LINK > DISASSEMBLY
for Preparation
Click here
HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
1. REMOVE LATERAL CONTROL ROD BUSHING SUB-ASSEMBLY
Using SST, lateral control rod bushing sub-assembly from the toe control link sub-assembly LH.
SST
09710-18010