REMOVAL
| Symbol Meaning | |
|---|---|
|
Remove Weld Points |
|
Cut and Join Location |
|
Cut Location for Supply Parts |
*1 in illustration above indicates where the adhesive is located.
Roughly cut open the panel so that the adhesive can be reached. Cut through the adhesive with a cut chisel to remove the panel.
In cases where the adhesive cannot be removed with a cut chisel, heat the adhesive with an industrial heater gun or gas burner taking care not to cause panel deformation by overheating.
INSTALLATION
| Symbol Meaning | |
|---|---|
|
Spot Weld |
|
Plug Weld |
|
Cut and Join Location |
|
Butt Weld |
|
Body Sealer |
Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.
Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)
If the entire supply part is not needed, remove the part of the supply part that is needed.
Before temporarily installing the new parts, weld the quarter panel, door lock striker retainer subassembly and fuel inlet box with the standard number of welding points.
Before installing a new part, apply body sealer.
Apply body sealer in an even continuous bead.
Before installing a new part, apply body sealer.
Apply body sealer evenly about 5 mm (0.20 in.) from the flange, avoiding any oozing.
Apply body sealer evenly, about 3 to 4 mm (0.12 to 0.16 in.) in diameter.
Apply adhesive (3MTM AutomixTM Panel Bonding Adhesive #8115) to the area indicated by *1 in the illustration.
Apply enough adhesive for the panels to stick to each other.
After welding, apply body sealer to the corresponding parts. (See the painting / coating)
After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.