Home › Engine / Hybrid System › K3-VE ENGINE MECHANICAL › DRIVE BELT › 2011.11–2015.08
RM19Y0E _51 Engine / Hybrid System _002970 K3-VE ENGINE MECHANICAL _0015003 DRIVE BELT A

K3-VE ENGINE MECHANICAL  DRIVE BELT  INSTALLATION  


PROCEDURE

Hide 16361A 1.INSTALL FAN AND GENERATOR V BELT

a.

Temporarily install the fan and generator V belt onto each pulley.


Hide 16361A 2.ADJUST FAN AND GENERATOR V BELT

A261156N06
1.74,0.667 2.094,1.021 0.354,0.354 10 A 0.813,0.979 1.167,1.375 0.354,0.396 10 C 2,1.938 2.396,2.177 0.396,0.24 10 B

a.

Turn adjusting bolt C and adjust the tension of the fan and generator V belt.


b.

Tighten fixing bolts A and B.

Torque:
for bolt A : 19 N*m (194 kgf*cm, 14 ft.*lbf)
for bolt B : 42 N*m (428 kgf*cm, 31 ft.*lbf)
: N*m ( kgf*cm, ft.*lbf)