Home › Engine / Hybrid System › K3-VE EMISSION CONTROL › PURGE VALVE › 2011.11–2015.08
RM19Y0E _51 Engine / Hybrid System _002974 K3-VE EMISSION CONTROL _0015034 PURGE VALVE A

K3-VE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 25860 1.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

a.

Install the No. 1 vacuum switching valve assembly with the 2 bolts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


b.

Connect the 2 vacuum hoses.


c.

Connect the connector.