1.INSPECT SHIFT LOCK CONTROL ECU
| *a | Component with harness connected
(Shift Lock Control ECU) |
Measure the voltage according to the value(s) in the table below.
Do not disconnect the shift lock control ECU connector.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 4 (STP) - 1 (E) | Brake pedal depressed | 11 to 14 V |
| Brake pedal released | Below 1 V | |
| 5 (KLS+) - 1 (E) | 1. Ignition switch ACC and shift lever in P | Below 1 V |
| 2. Ignition switch ACC and shift lever not in P
(Within approximately 1 second) |
7.5 to 10.5 V | |
| 3. Ignition switch ACC and shift lever not in P
(After approximately 1 second) |
6 to 9 V | |
| 6 (ACC) - 1 (E) | Ignition switch ACC | 11 to 14 V |
| Ignition switch ON | 11 to 14 V | |
| Ignition switch off | Below 1 V | |
| 8 (IG) - 1 (E) | Ignition switch ON | 11 to 14 V |
| Ignition switch off | Below 1 V |
If the result is not as specified and there are no problems with the wire harness, replace the shift lock control ECU.
Measure the resistance according to the value(s) in the table below.
Do not disconnect the shift lock control ECU connector.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 (E) - Body ground | When battery voltage not applied | Below 1 Ω |
If the result is not as specified and there are no problems with the wire harness, replace the shift lock control ECU.
2.INSPECT TRANSMISSION CONTROL SWITCH
| *a | Component with harness connected
(Transmission Control Switch) |
Measure the resistance according to the value(s) in the table below when the shift lever is moved to each position.
| Tester Connection | Shift Lever Position | Specified Condition |
|---|---|---|
| 4 (NSSD) - 1 (AT3) | 2 and 3 | Below 1 Ω |
| Except 2 and 3 | 10 kΩ or higher | |
| 4 (NSSD) - 2 (ATD) | Except 2 and 3 | Below 1 Ω |
| 2 and 3 | 10 kΩ or higher |
If the result is not as specified, replace the transmission floor shift assembly.
3.INSPECT SHIFT LOCK SOLENOID
| *a | Component with harness connected
(Shift Lock Solenoid) |
Measure the resistance according to the value(s) in the table below when the shift lever is moved to each position.
| Tester Connection | Shift Lever Position | Specified Condition |
|---|---|---|
| 4 (P) - 3 (E2) | P | 10 kΩ or higher |
| Except P | Below 1 Ω |
If the result is not as specified, replace the transmission floor shift assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 (SLS+) - 2 (SLS-) | When battery voltage not applied | 112 Ω |
If the result is not as specified, replace the transmission floor shift assembly.