Home › Drivetrain › M5S MANUAL TRANSMISSION / TRANSAXLE › OUTPUT SHAFT
RM19Y0E _52 Drivetrain _002985 M5S MANUAL TRANSMISSION / TRANSAXLE _0015108 OUTPUT SHAFT G

M5S MANUAL TRANSMISSION / TRANSAXLE  OUTPUT SHAFT  INSPECTION  


PROCEDURE

Hide 33367 1.INSPECT NO. 1 SYNCHRONIZER RING

C150312

a.

Coat the output reduction gear cone with manual transmission gear oil. Check the braking effect of the No. 1 synchronizer ring. Turn the No. 1 synchronizer ring in one direction while pushing it against the output reduction gear cone. Check that the ring locks.

If the braking effect is insufficient, apply a small amount of the fine lapping compound between the No. 1 synchronizer ring and output reduction gear cone. Lightly rub the No. 1 synchronizer ring and output reduction gear cone together.

NOTICE:

Ensure the fine lapping compound is completely washed off after rubbing.



b.

Check again the braking effect of the No. 1 synchronizer ring.


c.
C150313

Using a feeler gauge, measure the clearance between the No. 1 synchronizer ring back and output reduction gear spline end.

Standard clearance:

0.95 to 1.35 mm (0.0374 to 0.0531 in.)


Minimum clearance:

0.95 mm (0.0374 in.)


If the clearance is less than the minimum, replace the synchronizer ring.