48820
1.INSPECT FRONT STABILIZER LINK ASSEMBLY
As shown in the illustration, flip the ball joint stud back and forth 5 times before installing the nut.
Using a torque wrench, turn the nut continuously and take the torque reading on the 3rd turn.
0.05 to 1.96 N*m (0.5 to 20 kgf*cm, 0.4 to 17.3 in.*lbf)
Check for any cracks and grease leakage on the ball joint dust cover.