1.INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP
If reusing the clips, do not remove the double sided tape remaining on the clips and where the clips will be installed on the body.
If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.
Follow these procedures only when replacing the clips.
| *1 | Adhesive |
| *a | 2 to 3 mm Bead of Adhesive |
Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips.
Adhesive strength (tensile strength): 13.7 Mpa (140 kgf/cm2, 1987 psi) or more when the temperature is 23°C (73°F).
Install new 2 clips in the positions as shown in the illustration. Press in the clips by hand.
| Area | Measurement |
|---|---|
| a | 1.0 to 2.0 mm (0.039 to 0.078 in.) |
| b | 1.2 to 2.2 mm (0.047 to 0.086 in.) |
| c | 1.0 to 2.0 mm (0.039 to 0.078 in.) |
| d | 0.4 to 1.4 mm (0.016 to 0.055 in.) |
After pressing in the clips, wait 30 minutes or more before installing the roof drip side finish moulding.
Minimum hardening time: 30 minutes.
Time needed for complete hardening: 24 hours.
75552
2.INSTALL ROOF DRIP SIDE FINISH MOULDING LH
Engage the 2 clips and install the roof drip side finish moulding LH.
Remove the protective tape.