Home › Engine / Hybrid System › 1NR-VE ENGINE CONTROL › ECM › from 2015.08
RM19Y0E _51 Engine / Hybrid System _042271 1NR-VE ENGINE CONTROL _0196153 ECM A

1NR-VE ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89539F 1.INSTALL ECU BRACKET

a.

Install the ECU bracket onto the ECM with the 4 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 89561 2.INSTALL ECM

a.

Install the ECM with ECU bracket with the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)

NOTICE:

If a component has been dropped or subjected to a strong impact, replace it.



b.
A361378

Connect the 2 ECM connectors and lower the 2 levers.

NOTICE:
·

When connecting the connectors, make sure that dirt, water or other foreign matter does not contact the connecting parts of the connectors.

·

Make sure that the 2 levers are locked securely.




c.

Connect the harness clamp.


Hide 3.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
6.4 N*m (65 kgf*cm, 57 in.*lbf)