Home › Engine / Hybrid System › 1NR-VE EMISSION CONTROL › PURGE VALVE › from 2015.08
RM19Y0E _51 Engine / Hybrid System _042277 1NR-VE EMISSION CONTROL _0196212 PURGE VALVE A

1NR-VE EMISSION CONTROL  PURGE VALVE  REMOVAL  


PROCEDURE

Hide 25860 1.REMOVE NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

a.
A363956C01
2.146,1.021 2.552,1.135 true 1.938,1.01 2.219,1.531 true 2.604,1.083 2.854,1.281 0.25,0.198 10 true *1 2.25,1.521 2.5,1.719 0.25,0.198 10 true *2
*1 No. 1 Charcoal Canister Outlet Hose
*2 No. 2 Fuel Vapor Feed Hose


Disconnect the No. 1 vacuum switching valve assembly connector.


b.

Disconnect the No. 1 charcoal canister outlet hose and No. 2 fuel vapor feed hose.


c.

Remove the bolt and No. 1 vacuum switching valve assembly.