Home › Engine / Hybrid System › 2NR-VE EMISSION CONTROL › PURGE VALVE › from 2015.08
RM19Y0E _51 Engine / Hybrid System _042278 2NR-VE EMISSION CONTROL _0196216 PURGE VALVE A

2NR-VE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 25860 1.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

a.

Install the No. 1 vacuum switching valve assembly with the bolt.

Torque:
8.8 N*m (90 kgf*cm, 78 in.*lbf)


b.
A360457C01
2.75,2.594 2.896,2.375 2.896,2.375 3.073,2.375 true 0.948,0.688 1.292,0.719 true 3.083,2.292 3.365,2.573 0.281,0.281 10 false *a 2.635,2.125 2.948,2.281 0.313,0.156 10 false *b 0.281,0.427 0.594,0.583 0.313,0.156 10 false *c 0.823,1.146 1.135,1.302 0.313,0.156 10 false *d 0.74,0.844 1.052,1 0.313,0.156 10 false *e 1.333,0.656 1.646,0.813 0.313,0.156 10 false *a 2.156,2.198 2.469,2.396 0.313,0.198 10 false *1 0.344,0.135 0.656,0.333 0.313,0.198 10 false *2
*1 No. 1 Charcoal Canister Outlet Hose
*2 No. 2 Fuel Vapor Feed Hose
*a Paint Mark
*b Upper Side
*c Front Side
*d LH Side
*e 40°


Connect the No. 1 charcoal canister outlet hose and No. 2 fuel vapor feed hose as shown in the illustration.