Home › Engine / Hybrid System › 1NR-VE INTAKE / EXHAUST › EXHAUST PIPE › from 2015.08
RM19Y0E _51 Engine / Hybrid System _042279 1NR-VE INTAKE / EXHAUST _0196222 EXHAUST PIPE A

1NR-VE INTAKE / EXHAUST  EXHAUST PIPE  REMOVAL  


PROCEDURE

Hide 17430 1.REMOVE TAIL EXHAUST PIPE ASSEMBLY

a.
A361314C01
3.417,2.167 3.333,2.167 false
V100135

Bolt
V100136

Nut


Remove the 2 bolts and 2 nuts.


b.
A361315C01
2.854,1.344 2.188,0.521 2.188,0.521 2.823,0.969 true 1.094,0.479 0.865,0.823 true 2.021,0.396 2.333,0.594 0.313,0.198 10 false *1 0.719,0.833 1.031,1.031 0.313,0.198 10 true *2
*1 No. 2 Exhaust Pipe Support
*2 No. 3 Exhaust Pipe Support


Disconnect the 2 No. 2 exhaust pipe supports and No. 3 exhaust pipe support, and then remove the tail exhaust pipe assembly.


Hide 17451 2.REMOVE EXHAUST PIPE GASKET

a.

Remove the exhaust pipe gasket from the front exhaust pipe assembly.


Hide 17410 3.DISCONNECT FRONT EXHAUST PIPE ASSEMBLY

a.
A361329C01
1.688,1.99 1.49,1.729 true 1.688,1.979 2,2.177 0.313,0.198 10 false *1
*1 No. 2 Exhaust Pipe Support


Remove the 2 bolts and 2 compression springs.


b.

Disconnect the No. 2 exhaust pipe support.


Hide 58151A 4.REMOVE NO. 1 FLOOR HEAT INSULATOR

A361313C01
3.333,2.167 3.427,2.167 false
V113147

Remove in this direction


a.

Remove the 2 bolts and No. 1 floor heat insulator in the direction indicated by the arrow.


Hide 17410 5.REMOVE FRONT EXHAUST PIPE ASSEMBLY

a.

Remove the front exhaust pipe assembly.


Hide 17451 6.REMOVE EXHAUST PIPE GASKET

a.

Remove the exhaust pipe gasket from the exhaust manifold converter sub-assembly.