1.INSPECT STARTER RELAY
Remove the No. 1 relay block cover.
Click hereEngine / Hybrid System>1NR-VE ENGINE CONTROL>INTEGRATION RELAY>REMOVAL
Disconnect the No. 1 integration relay.
Click hereEngine / Hybrid System>1NR-VE ENGINE CONTROL>INTEGRATION RELAY>REMOVAL
Remove the ST No. 2 relay from the No. 1 integration relay.
Check the resistance.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 - 5 | Battery voltage not applied | 10 kΩ or higher |
| 3 - 5 | Battery voltage applied to terminals 1 and 2 | Below 1 Ω |
If the result is not as specified, replace the ST No. 2 relay.
Install the ST No. 2 relay to the No. 1 integration relay.
Connect the No. 1 integration relay.
Click hereEngine / Hybrid System>1NR-VE ENGINE CONTROL>INTEGRATION RELAY>INSTALLATION
Install the No. 1 relay block cover.
Click hereEngine / Hybrid System>1NR-VE ENGINE CONTROL>INTEGRATION RELAY>INSTALLATION