Home › Engine / Hybrid System › 2ZR-FXE (EMISSION CONTROL) › CANISTER › 2016.10–2018.05
RM32K0E _51 Engine / Hybrid System _060064 2ZR-FXE EMISSION CONTROL _0294229 CANISTER G

2ZR-FXE EMISSION CONTROL  CANISTER  INSPECTION  


PROCEDURE

Hide 77740 1.INSPECT CANISTER (CHARCOAL CANISTER ASSEMBLY)

a.

Visually check the canister (charcoal canister assembly).

i.

Visually check the canister (charcoal canister assembly) for cracks or damage.

If cracks or damage are found, replace the canister (charcoal canister assembly).



b.

Check canister (charcoal canister assembly) operation.

i.
A377740C01
2.146,0.594 2.292,0.594 2.292,0.594 2.573,1.042 true 0.688,1.365 0.688,1.01 false 2.448,1.667 2.448,1.313 false 2.365,1.677 2.688,1.938 0.323,0.26 10 false *a 0.615,1.396 1.01,1.667 0.396,0.271 10 false *b 1.958,0.51 2.24,0.729 0.281,0.219 10 false *c 3.115,1.115 3.323,1.375 0.208,0.26 10 false *d
*a Vent Line Port
*b Air Line Port
*c Purge Line Port
*d Air


With the purge line port closed, blow 0.5 kPa (0.005 kgf/cm2, 0.1 psi) of air into the vent line port, and check that air flows from the air line port.

If the result is not as specified, replace the canister (charcoal canister assembly).


ii.
A377741C01
0.813,1.417 0.813,1.021 false 2.604,1.708 2.604,1.313 true 2.729,1.052 2.958,0.552 2.958,0.552 3.073,0.552 false 2.521,1.729 2.74,1.969 0.219,0.24 10 false *a 0.75,1.458 1.052,1.677 0.302,0.219 10 false *b 3.094,0.469 3.323,0.708 0.229,0.24 10 false *c 0.021,0.948 0.365,1.25 0.344,0.302 10 false *d
*a Vent Line Port
*b Air Line Port
*c Purge Line Port
*d Air


With the vent line port closed, blow 0.5 kPa (0.005 kgf/cm2, 0.1 psi) of air into the air line port, and check that air flows from the purge line port.

If the result is not as specified, replace the canister (charcoal canister assembly).



c.

Check for air leaks.

i.
A377742C02
0.542,1.813 0.542,1.448 true 1.844,2.177 2.01,2.177 2.01,2.177 2.302,1.729 true 2.094,0.917 2.26,0.917 2.26,0.917 2.573,1.5 true 2.667,2.344 2.833,1.958 2.833,1.958 3.01,1.958 true 3.052,1.854 3.323,2.073 0.271,0.219 10 false *a 0.458,1.833 0.792,2.125 0.333,0.292 10 false *c 1.906,0.833 2.219,1.031 0.313,0.198 10 false *d 1.656,2.094 1.885,2.313 0.229,0.219 10 false *b
*a Pressure Gauge
*b Vent Line Port
*c Air Line Port
*d Purge Line Port


Connect a pressure gauge to the vent line port.


ii.

With the purge line port and air line port closed, apply 20 kPa (150 mmHg, 5.91 in. Hg) of pressurized air into the vent line port, then confirm that pressure is maintained for 1 minute.

If the result is not as specified, replace the canister (charcoal canister assembly).