The main relay supplies power to the switching solenoid and the linear solenoid.
The main relay remains on for approximately 2 minutes after the power switch is turned off and the input of brake pedal operation signals stops, and supplies power to the system to keep it ready to operate.
| DTC No. | Detection Item | INF Code | DTC Detection Condition | Trouble Area | Note |
|---|---|---|---|---|---|
| C1311 | Open Circuit in Main Relay 1 | 1 | Either of the following is detected:
1.
When the power switch is on (READY): The BS terminal voltage is less than 3.5 V for 0.05 seconds or more, when the IG1 terminal voltage is 9.5 V or more and operation of the main relay is requested. 2.
When the power switch is off: The BS terminal voltage is less than 3.5 V for 0.05 seconds or more, when operation of the main relay is requested. |
·
Open or short in main relay circuit ·
Skid control ECU (brake booster with master cylinder assembly) |
Electronically controlled brake system DTC |
| C1312 | Short Circuit in Main Relay 1 | 2 | The BS terminal voltage is 3.5 V or more for 4.5 seconds or more, when operation of the main relay is requested. | ·
Short in main relay circuit ·
Main relay internal stuck ·
Skid control ECU (brake booster with master cylinder assembly) |
Electronically controlled brake system DTC |
| Vehicle Condition | |||
|---|---|---|---|
| Pattern 1 | Pattern 2 | ||
| Diagnosis Condition | When the power switch is on (READY), the IG1 terminal voltage is 9.5 V or more. | ○ | - |
| When the power switch is off. | - | ○ | |
| Malfunction Status | The BS terminal voltage is less than 3.5 V, when operation of the main relay is requested. | ○ | - |
| The BS terminal voltage is less than 3.5 V, when operation of the main relay is requested. | - | ○ | |
| Detection Time | 0.05 seconds or more | 0.05 seconds or more | |
| Number of Trips | 1 trip | 1 trip | |
DTC will be output when conditions for either of the patterns in the table above are met.
Refer to DTCs C1241 and C1242.
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>C1241
After replacing the skid control ECU (brake booster with master cylinder assembly), perform linear solenoid valve offset learning, ABS holding solenoid valve learning, yaw rate and acceleration sensor zero point calibration and system information memorization after performing "Reset Memory".
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>INITIALIZATION
Inspect the fuses for circuits related to this system before performing the following procedure.
Select the Active Test on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| ECB Main Relay | Main relay | Relay ON/OFF | ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
Select the Data List on the GTS.
| Tester Display | Measurement Item | Range | Normal Condition | Diagnostic Note |
|---|---|---|---|---|
| ECB Main Relay | Main relay operation request | ON or OFF | ON: Relay on
OFF: Relay off |
ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
Check that the condition of the main relay observed on the GTS changes according to GTS operation.
| Result | Proceed to |
|---|---|
| Main relay in the Data List turns ON/OFF using the Active Test. | A |
| Main relay in the Data List does not change using the Active Test. | B |
A
B
| *a | Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
The connector is securely connected.
Disconnect the A39 skid control ECU (brake booster with master cylinder assembly) connector.
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A39-52 (BS) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Reconnect the A39 skid control ECU (brake booster with master cylinder assembly) connector.
Clear the DTCs.
Turn the power switch off.
Turn the power switch on (IG).
Check if the same DTC is output.
| Result | Proceed to |
|---|---|
| DTCs C1311 and C1312 are not output. | A |
| DTCs C1311 and/or C1312 are output. (for LHD) | B |
| DTCs C1311 and/or C1312 are output. (for RHD) | C |
A
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
B
C
| *a | Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Turn the power switch off.
Make sure that there is no looseness at the locking part and the connecting part of the connector.
The connector is securely connected.
Disconnect the A39 skid control ECU (brake booster with master cylinder assembly) connector.
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A39-15 (+BI1) - Body ground | Always | 11 to 14 V |
| A39-5 (+BI2) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *a | Front view of wire harness connector
(to Skid Control ECU (Brake Booster with Master Cylinder Assembly)) |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A39-52 (BS) - Body ground | Always | 11 to 14 V |
| Result | Proceed to |
|---|---|
| OK (for LHD) | A |
| OK (for RHD) | B |
| NG | C |
A
B
C