Home › Engine / Hybrid System › 2ZR-FXE (HYBRID / BATTERY CONTROL) › HV RELAY ASSEMBLY (for NICKEL METAL HYDRIDE BATTERY) › from 2019.09
RM32K0E _51 Engine / Hybrid System _083958 2ZR-FXE HYBRID / BATTERY CONTROL _0404385 HV RELAY ASSEMBLY(for NICKEL METAL HYDRIDE BATTERY) G

2ZR-FXE HYBRID / BATTERY CONTROL  HV RELAY ASSEMBLY(for NICKEL METAL HYDRIDE BATTERY)  INSPECTION  


PROCEDURE

Hide 1.INSPECT HV BATTERY JUNCTION BLOCK ASSEMBLY

a.

Inspect SMRB:

i.

Measure the resistance according to the value(s) in the table below.

A378136C66
3.844,1.073 4.208,1.281 0.365,0.208 3.167,0.208 3.552,0.427 0.385,0.219 5.625,0.177 6.042,0.385 0.417,0.208 3.385,1.188 3.094,1.354 true 3.604,1.188 3.844,1.375 true 3.021,0.406 3.354,0.667 true 5.813,0.708 6.313,1.125 true 0.104,0.094 0.417,0.25 0.313,0.156 10 false *a 3.708,1.385 4.177,1.552 0.469,0.167 10 true SMRB 2.927,1.385 3.271,1.604 0.344,0.219 10 true GND 2.677,0.313 2.979,0.479 0.302,0.167 10 true CBI 3.896,1.104 4.208,1.26 0.313,0.156 10 false M42 3.229,0.24 3.479,0.406 0.25,0.167 10 true T3 6.396,1.115 6.573,1.313 0.177,0.198 10 true + 5.688,0.198 5.979,0.354 0.292,0.156 10 true A
*a Component without harness connected
(HV Battery Junction Block Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
T3-1 (CBI) - A-1 (+) Auxiliary battery voltage not applied between terminals M42-1 (SMRB) and M42-3 (GND) 10 kΩ or higher
Auxiliary battery voltage applied between terminals M42-1 (SMRB) and M42-3 (GND) Below 1 Ω



ii.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
M42-1 (SMRB) - M42-3 (GND) -40 to 80°C (-40 to 176°F) 20.6 to 40.8 Ω


If the result is not as specified, replace the HV battery junction block assembly.



b.

Inspect SMRG:

i.

Measure the resistance according to the value(s) in the table below.

A378136C67
3.844,1 4.208,1.208 0.365,0.208 1.156,0.167 1.521,0.375 0.365,0.208 2.24,0.177 2.604,0.385 0.365,0.208 3.385,1.188 3.573,1.375 true 3.271,1.177 3.063,1.365 true 1.323,0.656 0.74,0.958 true 2.063,0.542 2.385,0.656 true 0.104,0.094 0.417,0.25 0.313,0.156 10 false *a 3.896,1.042 4.208,1.198 0.313,0.156 10 false M42 3.469,1.396 3.833,1.583 0.365,0.188 10 true GND 2.865,1.396 3.354,1.583 0.49,0.188 10 true SMRG 0.604,0.99 0.823,1.135 0.219,0.146 10 true - 1.198,0.198 1.49,0.344 0.292,0.146 10 true z10 2.292,0.208 2.531,0.354 0.24,0.146 10 true T2 1.74,0.458 2.031,0.635 0.292,0.177 10 true CEI
*a Component without harness connected
(HV Battery Junction Block Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
T2-1 (CEI) - z10-1 (-) Auxiliary battery voltage not applied between terminals M42-4 (SMRG) and M42-3 (GND) 10 kΩ or higher
Auxiliary battery voltage applied between terminals M42-4 (SMRG) and M42-3 (GND) Below 1 Ω



ii.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
M42-4 (SMRG) - M42-3 (GND) -40 to 80°C (-40 to 176°F) 20.6 to 40.8 Ω


If the result is not as specified, replace the HV battery junction block assembly.



c.

Inspect SMRP:

i.

Measure the resistance according to the value(s) in the table below.

A378136C68
3.844,1 4.208,1.208 0.365,0.208 1.156,0.167 1.521,0.375 0.365,0.208 2.24,0.177 2.604,0.385 0.365,0.208 3.51,1.188 3.698,1.375 true 3.396,1.177 3.188,1.365 true 1.323,0.656 0.74,0.958 true 2.063,0.542 2.385,0.656 true 0.104,0.094 0.417,0.25 0.313,0.156 10 false *a 3.896,1.042 4.208,1.198 0.313,0.156 10 false M42 3.021,1.396 3.375,1.563 0.354,0.167 10 true GND 3.552,1.396 4.042,1.573 0.49,0.177 10 true SMRP 0.594,0.99 0.813,1.135 0.219,0.146 10 true - 1.198,0.198 1.49,0.344 0.292,0.146 10 true z10 2.292,0.208 2.552,0.365 0.26,0.156 10 true T2 1.75,0.458 2.031,0.646 0.281,0.188 10 true CEI
*a Component without harness connected
(HV Battery Junction Block Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
T2-1 (CEI) - z10-1 (-) Auxiliary battery voltage applied between terminals M42-2 (SMRP) and M42-3 (GND) 10 kΩ or higher
Auxiliary battery voltage applied between terminals M42-2 (SMRP) and M42-3 (GND) 24.3 and 29.7 Ω



ii.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
M42-2 (SMRP) - M42-3 (GND) -40 to 80°C (-40 to 176°F) 140 to 290 Ω


If the result is not as specified, replace the HV battery junction block assembly.