Home › Engine / Hybrid System › 2ZR-FXE (HYBRID / BATTERY CONTROL) › FUSE BOX (for NICKEL METAL HYDRIDE BATTERY) › from 2019.09
RM32K0E _51 Engine / Hybrid System _083958 2ZR-FXE HYBRID / BATTERY CONTROL _0404388 FUSE BOX(for NICKEL METAL HYDRIDE BATTERY) G

2ZR-FXE HYBRID / BATTERY CONTROL  FUSE BOX(for NICKEL METAL HYDRIDE BATTERY)  INSPECTION  


PROCEDURE

Hide G92Z2 1.INSPECT HYBRID BATTERY TERMINAL BLOCK

a.
A367707

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Hybrid Battery Terminal Block Always Below 1 Ω


If the result is not as specified, replace the hybrid battery terminal block.