The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during the No. 1 integration relay removal/installation are shown below.
1. PRECAUTION
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
2.DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
for 8NR-FTS:
for 3ZR-FAE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
82662A
3.REMOVE NO. 1 RELAY BLOCK COVER
|
Remove in this Direction |
Disengage the claws to remove the No. 1 relay block cover as shown in the illustration.
82641
4.REMOVE NO. 1 INTEGRATION RELAY
| *a | Protective Tape |
|
Remove in this Direction |
Using a screwdriver with its tip wrapped in protective tape, disengage the claws.
Pull up the No. 1 integration relay as shown in the illustration.
When pulling the No. 1 integration relay, take care not to damage it.
Disconnect the 2 connectors to remove the No. 1 integration relay.
When pulling the No. 1 integration relay, take care not to damage it.