ID Code Box Power Source Circuit
Circuit diagnosis · Vehicles built from Jun 2009
Versions by build date: Oct 2006 – May 2009 from Jun 2009
DESCRIPTION
This circuit provides power to operate the ID code box.WIRING DIAGRAM


INSPECTION PROCEDURE
- NOTICE:
- If the ID code box is replaced, register the key and ECU communication ID.
| 1. INSPECT FUSE (EFI NO. 1) |
 |
Remove the EFI No. 1 fuse from the No. 1 engine room R/B.
Measure the resistance of the fuse.
- Standard resistance:
- Below 1 Ω
|
NG |
 |
|
|
|
| OK |
|
 |
|
| 2. CHECK HARNESS AND CONNECTOR (ID CODE BOX - BATTERY) |
 |
- Disconnect the E50 ID code box connector.
Measure the voltage according to the value(s) in the table below.
- Standard voltage:
Tester Connection
|
Specified Condition
|
E50-1 (+B) - Body ground
|
10 to 14 V
|
|
NG |
 |
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
| OK |
|
 |
|
| 3. CHECK HARNESS AND CONNECTOR (ID CODE BOX - BODY GROUND) |
 |
- Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
|
Specified Condition
|
E50-8 (GND) - Body ground
|
Below 1 Ω
|
|
NG |
 |
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
| OK |
|
 |
|
| PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)
|
|