INSPECTION
Inspection · Vehicles built from Jun 2009
Versions by build date: Jun 2006 – May 2009 from Jun 2009
| INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION |
Apply the parking brake and turn the ignition switch on (IG).
Depress the brake pedal and check that the engine starts only when the shift lever is set in the N or P position.
Check that the back-up light comes on only when the shift lever is set in the R position and the light does not operate when the shift lever is in other positions.
If a failure is found, check the park/neutral position switch.
| INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Jack up the vehicle.

Disconnect the park/neutral position switch connector.
Measure the resistance according to the value(s) in the table below when the shift lever is moved to each position.
- Standard resistance:
Shift Position
Tester Connection
Specified Condition
P
2 - 6 and 4 - 5
Below 1 Ω
Except P
10 kΩ or higher
R
2 - 1
Below 1 Ω
Except R
10 kΩ or higher
N
2 - 9 and 4 - 5
Below 1 Ω
Except N
10 kΩ or higher
D and 4
2 - 7
Below 1 Ω
Except D and 4
10 kΩ or higher
3
2 - 3
Below 1 Ω
Except 3
10 kΩ or higher
2 and L
2 - 8
Below 1 Ω
Except 2 and L
10 kΩ or higher
