ECU Power Source Circuit
Circuit diagnosis · Vehicles built from Oct 2006
DESCRIPTION
This circuit provides power for main body ECU operation.WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. CHECK INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY (MAIN BODY ECU) (POWER SOURCE) |
Disconnect the ID J/B connector.

Measure the voltage according to the value(s) in the table below.
- Standard voltage:
Tester Connection
Specified Condition
ID-16 - Body ground
10 to 14 V
|
|
||||
| OK | |
| 2. CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL J/B - BODY GROUND) |
Disconnect the IF and IM J/B connectors.

Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Symbol (Tester Connection)
Specified Condition
IF-10 - Body ground
Below 1 Ω
IM-9 - Body ground
|
|
||||
| OK | ||
| ||
