2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Oct 2006 – May 2009

Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009


1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

  1. A093611E01
    Apply a light coat of engine oil to an O-ring of the camshaft timing oil control valve assembly sensor.

  1. A124556
    Install the camshaft timing oil control valve assembly sensor with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the camshaft timing oil control valve assembly connector.


2. INSTALL CLIP NUT

  1. A135665E01
    Install the clip nut.


3. INSTALL VACUUM HOSE CLAMP

  1. A135664
    Install the vacuum hose clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


4. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  1. A134904
    Install the engine cover with the 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

← INSTALLATION (Jun 2006 – Sep 2006)INSTALLATION (from Jun 2009) →