2006-2011 Camry Aurion · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built Jun 2006 – Sep 2006

Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009


1. REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY

  1. A134904
    Remove the 2 nuts and cover.


2. REMOVE AIR CLEANER CAP SUB-ASSEMBLY

  1. A144946E01
    Disconnect the mass air flow meter connector (*1).

  1. Disconnect the purge VSV connector (*2).

  1. Disconnect the 2 purge VSV vacuum hoses (*3).

  1. Disconnect the purge line hose from the clamp (*4).

  1. A146036
    Disconnect the No. 2 ventilation hose from the air cleaner hose.

  1. A135668
    Lock the No. 1 air cleaner hose clamp, and then disconnect the No. 1 air cleaner hose from the throttle body.

  1. A146037
    Remove the 2 bolts and air cleaner cap.

  1. Remove the air cleaner filter element from the air cleaner case.


3. REMOVE AIR CLEANER CASE SUB-ASSEMBLY

  1. A134905
    Disconnect the hose clamp.

  1. Remove the 3 bolts and air cleaner case.


4. REMOVE AIR CLEANER BRACKET

  1. A135673
    Remove the 2 bolts and air cleaner bracket.


5. DISCONNECT ECM CONNECTOR

  1. A135674
    Disconnect the 2 ECM connectors.

    NOTICE:
    After disconnecting the connector, make sure that dirt, water and other foreign matter does not contact the connecting part of the connector.


    1. Raise the 2 levers while pushing the locks on the levers, and disconnect the 2 ECM connectors.


6. REMOVE ECM

  1. A135675
    Remove the 3 bolts of the ECM with bracket.

  1. Remove the ECM with bracket.

  1. A135117
    Remove the 4 screws and ECM bracket.

← COMPONENTS (from Jun 2006)REMOVAL (Oct 2006 – May 2009) →