2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jun 2009

Versions by build date: Oct 2006 – May 2009 from Jun 2009


1. INSTALL TIMING CHAIN CASE OIL SEAL

  1. A125109E04
    Using SST, tap in a new oil seal until its surface is flush with the timing chain case edge.
    SST
    09223-22010  
    09506-35010  

    NOTICE:
    1. Keep the lip free from foreign matter.
    2. Do not tap on the oil seal at an angle.
    3. Make sure that the oil seal edge does not stick out of the timing chain case.


2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY

  1. Apply seal packing in a continuous line to the engine unit as shown in the following illustration.

    A132228E03

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal diameter:
    3.0 mm (0.118 in.)

    NOTICE:
    1. Be sure to clean and degrease the contact surfaces, especially the surfaces indicated by C in the illustration.
    2. When the contact surfaces are wet, wipe them with oil-free cloth before applying seal packing.
    3. Install the chain cover within 3 minutes.
    4. Do not start the engine for at least 2 hours after installing.

  1. Apply seal packing in a continuous line to the timing chain cover as shown in the following illustration.

    A134901E05

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
    Toyota Genuine Seal Packing Black 1282B, Three Bond 1282B or equivalent

    NOTICE:
    1. When the contact surfaces are wet, wipe them with oil-free cloth before applying seal packing.
    2. Install the chain cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.


    Apply seal packing as follows:
    Area
    Seal Packing Diameter
    Application Position from Inside Seal Line
    Continuous Line Area
    4.5 mm or more (0.177 in.)
    3.0 to 4.0 mm (0.118 to 0.158 in.)
    Alternate Long and Short Dashed Line Area
    3.5 mm or more (0.138 in.)
    2.0 to 3.0 mm (0.079 to 0.118 in.)
    Dashed Line Area
    3.5 mm or more (0.138 in.)
    3.0 to 4.0 mm (0.118 to 0.158 in.)
    Diagonal Line Area
    6.0 mm or more (0.236 in.)
    5.0 mm (0.197 in.)

  1. A128017E01
    Install a new gasket.

  1. A132229E02
    Align the oil pump's drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover to the crankshaft.

  1. Temporarily tighten the timing chain cover with the 23 bolts and 2 nuts.

    A128019E02

    Bolt length 
    Item
    Length
    Bolt A
    40 mm (1.57 in.)
    Bolt B
    55 mm (2.17 in.)
    Bolt C
    25 mm (0.98 in.)

    NOTICE:
    Make sure that there is no oil on the bolt threads.

  1. Fully tighten the bolts in: Area 1 and Area 2.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Fully tighten the bolts and nuts in: Area 3.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Tighten the bolts and nuts in the order of upper to lower as shown in the illustration.

  1. Fully tighten the bolts in : Area 4.

    Torque:
    Bolt A:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }
    Except bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Tighten the bolts in the order of lower to upper as shown in the illustration.


3. INSTALL WATER INLET HOUSING

  1. A129675E01
    Install 2 new O-rings.

    HINT:
    Apply a small amount of water or soapy water to O-ring (A) in the illustration before installing it.

  1. A137975E01
    Install the stud bolts.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. A134879E01
    Install the water inlet with the 2 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Be careful that the O-ring does not get caught between the parts.

  1. Connect the No. 1 water by-pass hose.

  1. Apply adhesive around the drain cock.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

  1. Install the drain cock to the water inlet housing.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

  1. Install the drain cock plug to the water drain cock.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }

  1. Install a new gasket to the thermostat.

  1. A134896E01
    Align the thermostat jiggle valve with the upper stud bolt, and insert the thermostat in the water inlet housing.

    HINT:
    The jiggle valve may be set within 10° of either side of the prescribed positions.

  1. A129673
    Install the water inlet with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


4. INSTALL NO. 1 ENGINE MOUNTING BRACKET FRONT LH

  1. A134961E01
    Install the engine mounting bracket with the 6 bolts.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }

    NOTICE:
    1. Install the water inlet and mounting bracket within 15 minutes after installing the chain cover.
    2. Do not start the engine for at least 2 hours after installation.

  1. When replacing a stud bolt, install it by using an E8 "TORX" socket wrench.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


5. INSTALL OIL PAN SUB-ASSEMBLY

  1. When replacing a stud bolt, install it by using an E8 "TORX" socket wrench.

    A136298E03

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf } for stud bolt A
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf } for stud bolt B

  1. A129684
    Install 2 new O-rings.

  1. A132232E01
    Apply seal packing in a continuous line as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal diameter:
    3.0 to 4.0 mm (0.118 to 0.156 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the oil pan within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.

  1. A153328E01
    Install the oil pan with the 16 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf } for bolt A
    21 N*m{ 214 kgf*cm , 15 ft.*lbf } for bolts except A


6. INSTALL OIL STRAINER SUB-ASSEMBLY

  1. A134963E02
    Using an E6 "TORX" socket, install the stud bolts as shown in the illustration.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. A129681E01
    Install a new gasket and the oil strainer with the bolt and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


7. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY

  1. A134964E01
    Using an E6 "TORX" socket, install the stud bolts as shown in the illustration.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. A132234E02
    Apply seal packing in a continuous line as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal diameter:
    3.0 to 4.0 mm (0.118 to 0.158 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the oil pan No. 2 within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.

  1. A129680E01
    Install the oil pan with the 16 bolts and 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


8. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY (for Bank 1)

  1. A132236E01
    Apply seal packing as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the head cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.

  1. A129699
    Install 3 new gaskets as shown in the illustration.

  1. Install a new gasket to the head cover.

  1. A129679E01
    Install the head cover with the 12 bolts and a new washer.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf } for bolt A
    10 N*m{ 102 kgf*cm , 7 ft.*lbf } for bolts except A

    HINT:
    After tightening all bolts, check the tightening torque of 1 and 11. Retighten the bolt if necessary.


9. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY (for Bank 2)

  1. A132237E01
    Apply seal packing as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the head cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.

  1. A129705
    Install 3 new gaskets as shown in the illustration.

  1. Install a new gasket to the head cover.

  1. A129678E03
    Install the head cover with the 12 bolts and a new washer.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf } for bolt A
    10 N*m{ 102 kgf*cm , 7 ft.*lbf } for bolts except A

    HINT:
    After tightening all bolts, check the tightening torque of 1 and 10. Retighten the bolt if necessary.


10. INSTALL CRANKSHAFT PULLEY
  1. Align the pulley set key with the key groove of the pulley, and slide it on the pulley.

  1. A122396E01
    Using SST, install the pulley bolt.
    SST
    09213-70011   (09213-70020)
    09330-00021  

    Torque:
    250 N*m{ 2,550 kgf*cm , 184 ft.*lbf }


11. INSTALL OIL COOLER PIPE

  1. A141494
    Install a new gasket to the oil pan sub-assembly.

  1. Install the oil cooler pipe with the bolt and 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }


12. INSTALL NO. 1 OIL PIPE
  1. Make sure that there is no foreign matter on the mesh of the oil control valve filter LH.

    NOTICE:
    Do not touch the mesh when installing the oil control valve filter.

  1. A135726E01
    Install the oil control valve filter LH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the head cover side).

  1. Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the oil check valve bolt.

  1. Tighten the oil pipe union (on the head cover side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

  1. Tighten the oil pipe union (on the cylinder head side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

    NOTICE:
    If the link that connects the gaskets is broken, remove the connecting link by using nippers or similar tools.


13. INSTALL OIL PIPE
  1. Make sure that there is no foreign matter on the mesh of the oil control valve filter RH.

    NOTICE:
    Do not touch the mesh when installing the oil control valve filter.

  1. A134878E02
    Install the oil control valve filter RH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the head cover side).

  1. Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the oil check valve bolt.

  1. Install the bolt (A) to the cylinder head.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Tighten the oil pipe union (on the head cover side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

  1. Tighten the oil pipe union (on the cylinder head side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

    NOTICE:
    If the link that connects the gaskets is broken, remove the connecting link by using nippers or similar tools.


14. INSTALL NO. 1 VACUUM SWITCHING VALVE

  1. A132992
    Install the No. 1 vacuum switching valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


15. INSTALL RADIO SETTING CONDENSER

  1. A132991
    Install the 2 radio setting condensers with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


16. INSTALL WATER PUMP PULLEY

  1. A128112E01
    Temporarily install the water pump pulley with the 4 bolts.

  1. Using SST, hold the water pump pulley.

    SST
    09960-10010   (09962-01000, 09963-00700)

  1. Tighten the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


17. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

  1. A129645E03
    Install the No. 2 idler pulley sub-assemblies and cover plates with the bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }


18. INSTALL NO. 2 TIMING GEAR COVER

  1. A132987
    Install the No. 2 timing gear cover with the 2 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


19. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  1. A129644E01
    Temporarily install the V-ribbed belt tensioner with the 5 bolts.

    HINT:
    Each bolt length is as follows:
    A: 70 mm (2.76 in.)
    B: 33 mm (1.30 in.)

  1. Install the V-ribbed belt tensioner by tightening the bolt 1 and bolt 2 in the order shown in the illustration.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Tighten the other bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }


20. INSTALL ENGINE MOUNTING BRACKET RH

  1. A129642
    Install the engine mounting bracket RH with the 3 bolts.

    Torque:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }


21. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

  1. A129649E01
    Install a new gasket as shown in the illustration.

  1. A129641
    Install the exhaust manifold sub-assembly LH with the 6 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


22. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR

  1. A129640
    Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }


23. INSTALL NO. 2 MANIFOLD STAY

  1. A140783
    Install the No. 2 manifold stay with the bolt and nut.

    Torque:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }


24. INSTALL OIL LEVEL GAUGE GUIDE SUB-ASSEMBLY

  1. A129638E01
    Install 2 new O-rings to the oil level gauge guide.

  1. Apply a light coat of engine oil to the O-rings.

  1. Push in the oil level gauge guide end into the guide hole.

  1. Install the No. 1 oil level gauge guide with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the No. 2 oil level gauge guide with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the oil level gauge.


25. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH

  1. A129650E01
    Install a new gasket as shown in the illustration.

  1. A129637
    Install the exhaust manifold sub-assembly RH with the 6 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


26. INSTALL NO. 2 A ENGINE MOUNTING STAY RH
  1. Install the No. 2 A engine mounting stay RH with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


27. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 6 ignition coil assemblies with the 6 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


28. INSTALL INTAKE AIR SURGE TANK ASSEMBLY

NOTICE:
DO NOT apply oil to the bolts listed below:
Tightening Parts
Surge Tank and Intake Manifold
No. 1 Surge Tank Stay and Cylinder Head Cover
No. 1 Surge Tank Stay and Surge Tank
Throttle Body Bracket and Cylinder Head Cover
Throttle Body Bracket and Surge Tank

  1. Install a new gasket to the intake air surge tank.

  1. A139209
    Using a 5 mm hexagon socket wrench, install the 4 bolts and 2 nuts.

    Torque:
    Bolt:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }
    Nut:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. Install the throttle body bracket and No. 1 surge tank stay with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A129467
    Connect the connector.

  1. A129466
    Install the vacuum hose clamp with the bolt.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

  1. Connect the No. 1 ventilation hose.

  1. A129464E04
    Install the clamp and connect the throttle with motor body assembly connector.

  1. Connect the vapor feed hose.

  1. Connect the 2 water by-pass hoses to the throttle body assembly.


29. REMOVE ENGINE STAND

30. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
(Click here)
← INSTALLATION (Oct 2006 – May 2009)COMPONENTS (from Oct 2006) →