Heater Control Panel Power Source Circuit
Circuit diagnosis · Vehicles built from Jun 2009
Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009
DESCRIPTION
Battery voltage is supplied to the heater control panel (A/C control assembly) through the A/C No. 2 fuse.WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. CHECK HARNESS AND CONNECTOR (IG+ - BODY GROUND) |
 |
- Disconnect the connector from the heater control panel.
Measure the voltage according to the value(s) in the table below.
- Standard voltage:
Tester Connection (Symbols)
|
Condition
|
Specified Condition
|
F16-5 (IG+) - Body ground
|
Ignition switch on (IG)
|
10 to 14 V
|
F16-5 (IG+) - Body ground
|
Ignition switch off
|
Below 1 V
|
|
NG |
 |
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
| OK |
|
 |
|
| 2. CHECK HARNESS AND CONNECTOR (GND - BODY GROUND) |
 |
- Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection (Symbols)
|
Condition
|
Specified Condition
|
F16-3 (GND) - Body ground
|
Always
|
Below 1 Ω
|
|
NG |
 |
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
| OK |
|
 |
|
| PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE |
|